LH2 arrived at KIT test site

On 12th of March a trailer with about 2 tons of LH2 arrived at the KIT Campus North test site finally.

Setting up the LH2 pool experiments

The preparations for the unignited pool evaporation (E3.4) and the ignited (E5.3) tests are on the way.

0.5 x 0.5 m2 pool set-up with concrete bottom plate

Start of the tests with a concrete floor mock-up is foreseen for tomorrow Friday 20 March 2020.